Commercial and off-grid specialist

Sunsynk installer in Bournemouth & Poole

Sunsynk is what we reach for when a site has to keep running: rack-mounted batteries, 30kW off-grid inverters and automatic generator hand-over. For a normal home battery we will usually point you to EcoFlow or Fox first.

Your quote and your payback, in writing, before anyone visits.

5-star rated on Google

The Max Events off-grid solar array installed on a warehouse roof in Dorchester
MCS certified logoNAPIT

MCS and NAPIT certified

Registered installers (NAP-78112), so your system qualifies for export payments

RECC registered logo

RECC member

The consumer code for home renewables

IWA insurance-backed warranty logo

Insurance-backed warranty

Our workmanship is covered even if we stopped trading

Insured to £2 million

Your roof and home are covered while we work

Our biggest Sunsynk job

An off-grid site near Dorchester, in numbers

Max Events runs a workshop, a school facility, cabins and a glamping field. It used to run on a diesel generator.

2 x 30kWSunsynk off-grid inverters
12 x 5.12kWhhigh-voltage batteries in two expandable racks
120450W solar panels, about 44,000kWh a year (a conservative estimate)
3 daysof roof work from start to finish
The Max Events off-grid solar array installed on a warehouse roof in Dorchester
The Max Events off-grid array

A real build

How the power never drops, and why it cost less than the grid

Max Events was quoted over £150,000 to connect to the grid. We designed an off-grid solar, battery and generator system for around £70,000 instead.

The generator and the Sunsynk inverters work as one. The generator starts when the batteries fall to 12%, syncs with the system, and hands back at 10%, so the site never loses power. The racks were built to expand, and a second barn is already planned.

The customer projects a saving of over £1,000,000 in diesel over the life of the system. That is their own calculation, not our promise.

Read the case study Off-grid solar

Who it suits

Is Sunsynk right for your site, or should you start with EcoFlow?

Sunsynk is the right tool if

  • There is no mains connection, or a grid connection would cost more than the system.
  • It is a business site that has to stay running, with a gateway and, where needed, a generator.
  • You need real power: 30kW inverters, stacked in racks you can expand.
  • You want commissioning done by the people who designed the system.

We would start somewhere else if

  • It is a normal home that wants a battery with the longest warranty. EcoFlow has 15 years.
  • Budget leads on a standard home install. Fox ESS is our value pick.
  • You want a simple grid-tied hybrid inverter, not an off-grid or commercial system. See Solis.
A Sunsynk stacked inverter and battery unit, wall-mounted in a garage (manufacturer render)
Sunsynk's wall-mounted range (manufacturer render). On commercial sites we fit rack-mounted kit

The kit

What we install, and the truth about reliability

We use Sunsynk's rack-mounted high-voltage batteries and its off-grid-capable hybrid inverters, including 30kW commercial units. Batteries are individual modules stacked into racks, so a site grows by adding modules rather than replacing anything.

It is a utilitarian set-up, chosen for sites that need to keep running rather than for how it looks on a wall.

You will find horror stories about any inverter brand online. In our experience they trace back to poor commissioning or an undersized system. We design, specify and commission every Sunsynk install ourselves, which is the fix.

What is in the box

A Sunsynk system, piece by piece

Rack-mounted batteries

High-voltage 5.12kWh modules, stacked into racks. Add modules later as the site grows.

30kW inverters

Off-grid-capable and built for commercial loads. Two of them run the Dorchester site.

Generator hand-over

An automatic transfer set-up, so the generator covers the worst winter week without oversizing the whole system.

Gateway for critical loads

Where a site cannot afford downtime, a gateway keeps the circuits that matter live.

Side by side

Sunsynk, Victron and EcoFlow: which for what

We have nothing against the others. This is about which job each is for.

What to compareSunsynkVictronEcoFlow PowerOcean
Best forCommercial and off-grid sitesOff-grid, leisure and marine, and a respected alternative for off-grid homesA straightforward home battery
Off-grid capableYesYesNot its main use
WarrantyThe maker’s terms, confirmed in your quote. We will not fit under 10 yearsThe maker’s terms, confirmed the same way15 years
How we use itRacks, 30kW inverters, generator hand-overAvailable on requestOur usual home recommendation

What it costs

Sunsynk cost: priced to the site, with one real benchmark

Over £150,000

What the grid connection was quoted at

For the Max Events site. Remote and three-phase sites are often quoted £70,000 to £150,000 or more.

Around £70,000

What the off-grid system cost instead

Solar, batteries, Sunsynk inverters and generator hand-over, designed for that site’s load.

One site, not a price list. Yours is quoted from your load, battery capacity and generator set-up. See commercial solar and off-grid solar for more.

How long until a commercial system pays back?

  • Commercial solar: 3 to 5 years
  • Our park-homes job: a projected 24 to 30 months

Illustrative, never guaranteed. Commercial return depends on your daytime load. Off-grid is measured against the grid connection or the diesel you avoid.

Get my own free quoteSee your monthly savings and years to payback

If you only want a home battery

Start with these instead

EcoFlow PowerOcean

Our usual home recommendation, with 15 years of warranty and 5kWh modules.

Read about EcoFlow

Fox ESS

The value pick, with a 10-year throughput-backed warranty and smart tariff trading.

Read about Fox ESS

Solis inverter

A proven, hands-off hybrid inverter if you want the battery and inverter kept separate.

Read about Solis

How it works on a site

From a first call about the site to a tested generator hand-over

Before you decide anything

  1. 1

    Tell us about the site

    What it runs, when, and what it costs you today (grid, diesel or both).

  2. 2

    A call about your loads

    A quick call from Phil or Jake to understand the site and what it must never lose.

  3. 3

    Design and written quote

    Sized from your real load, with the generator and gateway designed in. Compare it with any other quote.

  4. 4

    A survey, if you are happy

    We look at the roof, the plant room and the cable routes, and confirm the quote.

  1. 5

    Deposit, DNO and lead times

    We submit the DNO application where needed. Specialist kit can lengthen the lead time, so we tell you early.

  2. 6

    Install, with minimal disruption

    Roof work is planned around trading. On the Dorchester site it took 3 days.

  3. 7

    Commissioning and handover

    We commission it ourselves, test the generator hand-over, and set up monitoring before we leave.

Customer reviews

What customers say about working with us

Read all our reviews

Questions

Sunsynk questions, answered straight

Is Sunsynk actually any good, and is it right for my home?

Yes, it is a capable and reliable platform, and we use it deliberately. We fit it on commercial and off-grid sites, not as our default home battery. For a normal house we would usually start with EcoFlow or Fox ESS, and we will tell you if Sunsynk is the better answer for yours.

How much does a Sunsynk battery or inverter system cost?

Sunsynk systems are priced to the site: the load, the battery capacity and any generator integration. There is no honest flat figure, so we give you a written quote. As a guide to scale, we installed an off-grid solar, battery and generator system for around £70,000 on a site that had been quoted over £150,000 for a grid connection.

What are the common Sunsynk problems, and are the inverters reliable?

With any inverter brand, most problems come from poor commissioning or an undersized system rather than the hardware. That is why we specify and commission every Sunsynk install ourselves. If something does go wrong, diagnostics are free and we aim to visit within 5 working days for anything that is not an emergency.

Sunsynk or Victron or EcoFlow, which is better?

They suit different jobs. Sunsynk and Victron both suit commercial and off-grid sites. For a straightforward home battery we would usually recommend EcoFlow, for its 15-year warranty, or Fox ESS if budget leads. The right answer comes from your site, so we compare them against your load at survey.

How does a generator work with an off-grid Sunsynk system?

The inverters and generator are set up to work together automatically. On our Dorchester off-grid job the generator starts when the battery falls to 12%, syncs with the system, and hands back at 10%, so the power never drops. It is built to cover the worst winter week without oversizing the whole system.

Is Sunsynk suitable for a business?

Yes. Rack-mounted batteries and 30kW inverters are what we use for commercial sites, and we add a gateway and generator integration where a site cannot afford downtime. Even on larger jobs, there is minimal disruption to trading. Specialist kit can lengthen the lead time, so we tell you early.

Who near me installs Sunsynk properly?

We do. New Gen designs and installs Sunsynk systems across Bournemouth, Poole and Dorset, including a fully off-grid build near Dorchester. We are MCS and NAPIT certified, RECC members and insured to £2 million.

What does a Sunsynk install involve, and how long does it take?

A conversation about the site and its loads, a written design and quote, then a survey. After the deposit we apply for the DNO where needed and book the install. On our Dorchester job the roof work took 3 days. We commission everything ourselves and test the generator hand-over before we leave.

Tell us about the site and see your quote in writing